Sample damp and mould reports from one inspection
Four complete PDFs generated from the same fictional case, 24 Willow House, Exampletown (reference DEMO-LARGE-001). Each report is written for a different reader, from the surveyor and housing team to the household and the contractor, and all of them draw on one shared case record.
Fictional demonstration only: the property, findings, people and dates are invented, and the photographs are licensed stock images of other homes.
How the four reports fit together
The inspection recorded 14 findings and 12 linked remedial actions. The technical report holds the evidence; the resident summary explains it to the household; the schedule of works turns recommendations into assigned actions; and the follow-up records what reinspection verified. Because they come from one record, the letter to the household and the works order say the same thing as the evidence.
Report 1 of 4 · For surveyors, reviewers and housing teams
Full technical report for surveyors and housing teams
The complete record of the inspection. It states the scope and limitations first, then works through external and internal findings room by room, each with photographs, readings and a recommended next step, followed by the moisture schedule, risk assessment and recommended work programme.
What it contains
- Document control and approved revision
- Finding register (F01–F14)
- Environmental and moisture schedule
- Declaration and limitations

Report 2 of 4 · For the household
Resident summary written for the household
A short, plain-language version of the same inspection. It explains what was found, safety advice and next steps the household can take now, a room-by-room overview and who is arranging the work, without the internal technical narrative.
What it contains
- What we found
- Safety advice and next steps
- Your home, room by room
- Who is arranging the work

Report 3 of 4 · For repairs teams and contractors
Schedule of remedial works for repairs teams and contractors
Every recommendation from the technical report becomes a linked action with a responsible team, a programme target, a status and completion notes, so the works order matches the evidence.
What it contains
- Programme overview
- Linked remedial schedule
- Responsible team and target for each action
- Declaration and limitations

Report 4 of 4 · For the reviewer and housing team
Follow-up report recording reinspection and outstanding work
An interim follow-up that records which actions were verified and which remain open. In this example some work is still outstanding, so the case stays open. It is not a final clearance certificate.
What it contains
- Follow-up position
- Action verification record
- Outstanding actions
- Declaration and limitations

See the workflow behind the reports
These reports are examples only. To discuss using Survey Smarter Housing with your housing team or contractors, request a trial and we will reply by email.